Fracasos en la implantación de aplicaciones informáticas empresariales: Casos de estudio y sus principales causas
| dc.contributor.author | Salazar Fierro, Fausto Alberto | |
| dc.contributor.author | Guamán Cupacán, Byron Ramiro | |
| dc.contributor.author | León Fernández, Cayo Víctor | |
| dc.contributor.author | Pineda Manosalvas, Carpio Agapito | |
| dc.contributor.author | Reascos Paredes, Irving Marlon | |
| dc.contributor.author | Herrera Quispe, José Alfredo | |
| dc.contributor.orcid | Salazar Fierro, Fausto Alberto [0000-0003-1558-6721] | spa |
| dc.contributor.orcid | Guamán Cupacán, Byron Ramiro [0009-0006-0303-7206] | spa |
| dc.contributor.orcid | León Fernández, Cayo Víctor [0000-0003-1704-8214] | spa |
| dc.contributor.orcid | Pineda Manosalvas, Carpio Agapito [200000-0002-7175-1667] | spa |
| dc.contributor.orcid | Reascos Paredes, Irving Marlon [0000-0003-2237-0160] | spa |
| dc.contributor.orcid | Herrera Quispe, José Alfredo [0000-0002-8207-9714] | spa |
| dc.date.accessioned | 2024-09-19T13:53:29Z | |
| dc.date.available | 2024-09-19T13:53:29Z | |
| dc.date.issued | 2023-12-25 | |
| dc.description.abstract | Aunque existe una gran cantidad de estudios sobre los principales factores que conllevan al fracaso en la implantación de aplicaciones informáticas empresariales (AIE), todavía se tiene un alto índice de fracaso dentro de los proyectos de AIE dentro de las diferentes fases de la implantación, En esta investigación se analizó una serie de factores de fracaso dentro de la implantación de AIE, como también diferentes casos donde se produjo una implantación de una AIE fallida, con el objetivo de recopilar las diferentes causas comunes, y tener una base de factores recurrentes que se deberán tomar en cuenta para futuros proyectos. El método utilizado en la investigación fue mediante una revisión de la literatura, como también una búsqueda de casos ocurridos a partir de 2015, donde se tenga como punto en común los fracasos en la implantación de AIE. Posteriormente, se encontró que los factores detallados en los casos de estudio tienen relación con factores revisados en la revisión de la literatura, lo cual significa que estos factores son recurrentes y comunes. Finalmente se concluyó que la calidad, la gestión, el tiempo y el aspecto financiero son los factores que de forma general tuvieron relevancia en los casos analizados y que, a pesar del tipo o extensión del proyecto, la identificación de estos factores va a determinar de forma temprana el éxito o fracaso del proyecto. | spa |
| dc.description.abstractenglish | Although there are many studies on the main factors that lead to failure in implanting Enterprise I.T. Applications (EITA), EITA projects still have a high failure rate within the different implantation phases. In this literature review, several factors of failure in the implantation of EITA were analyzed, as well as various cases where there was a failed implantation of an EITA, to collect the different common causes and have a basis of recurring factors to be considered for future projects. The method used in the research was a literature review and a search for cases from 2015, where the common point is the failure in the implantation of EITAs. Subsequently, it was found that the factors detailed in the case studies are related to factors reviewed in the literature review, which means that these factors are recurrent and common. Finally, it was concluded that quality, management, time, and financial aspects are the factors that were generally relevant in the cases analyzed and that, despite the type or extent of the project, identifying these factors will determine early on the success or failure of the project. | eng |
| dc.format.mimetype | application/pdf | spa |
| dc.identifier.doi | https://doi.org/10.29375/25392115.4663 | |
| dc.identifier.instname | instname:Universidad Autónoma de Bucaramanga UNAB | spa |
| dc.identifier.issn | ISSN: 1657-2831 | spa |
| dc.identifier.issn | e-ISSN: 2539-2115 | spa |
| dc.identifier.repourl | repourl:https://repository.unab.edu.co | spa |
| dc.identifier.uri | http://hdl.handle.net/20.500.12749/26630 | |
| dc.language.iso | spa | spa |
| dc.publisher | Universidad Autónoma de Bucaramanga UNAB | spa |
| dc.relation | https://revistas.unab.edu.co/index.php/rcc/article/view/4663/3829 | spa |
| dc.relation.references | 12 famous ERP disasters, dustups and disappointments | CIO. (n.d.). Retrieved March 9, 2023, from https://www.cio.com/article/278677/enterprise-resource-planning-10-famous-erp-disasters-dustups-and-disappointments.html | |
| dc.relation.references | 4 Lessons Learned From The LeasePlan ERP Failure. (n.d.). Retrieved March 9, 2023, from https://www.panorama-consulting.com/leaseplan-erp-failure/ | |
| dc.relation.references | Ahonen, J. J., & Savolainen, P. (2010). Software engineering projects may fail before they are started: Post-mortem analysis of five cancelled projects. Journal of Systems and Software, 83(11), 2175–2187. https://doi.org/10.1016/J.JSS.2010.06.023 | |
| dc.relation.references | Alhazmi, A. K., Imtiaz, A., Al-Hammadi, F., & Kaed, E. (2021). Success and Failure Aspects of LMS in E-Learning Systems. International Journal of Interactive Mobile Technologies, 15(11), 133–147. https://doi.org/10.3991/ijim.v15i11.20805 | |
| dc.relation.references | Armijos Mera, O. D., & Delgado Guerrero, L. F. (2018). Revisión sistemática de literatura para la identificación de factores de éxito, fracaso y riesgos en la adopción de software libre. http://hdl.handle.net/10654/13523 | |
| dc.relation.references | Berhan, G., Negash, S., & Amoroso, D. (2009). Determinants of Business Process Management for Success Project Implementation in Low Income Countries. AMCIS 2009 Proceedings. https://aisel.aisnet.org/amcis2009/41 | |
| dc.relation.references | Carvallo Vega, J. P., Crespo Martinez, P. E., Carvajal Vargas, F. M., & Vintimilla Guzman, R. N. (2018). Systematic literature review: Success, failure, risks, benefits and barriers factors in the adoption of open source software. Proceedings - 3rd International Conference on Information Systems and Computer Science, INCISCOS 2018, 2018-Decem, 328–336. https://doi.org/10.1109/INCISCOS.2018.00054 | |
| dc.relation.references | Case Study 10: LeasePlan Paid $100 Million for a SAP System That Never Went Live - Henrico Dolfing. (n.d.). Retrieved March 9, 2023, from https://www.henricodolfing.com/2020/01/project-failure-case-study-leaseplan-sap.html | |
| dc.relation.references | Case Study 12: Lidl’s €500 Million SAP Debacle - Henrico Dolfing. (n.d.). Retrieved March 9, 2023, from https://www.henricodolfing.com/2020/05/case-study-lidl-sap-debacle.html | |
| dc.relation.references | Chatzoglou, P., Fragidis, L., Chatzoudes, D., & Symeonidis, S. (2016). Critical success factors for ERP implementation in SMEs. Proceedings of the 2016 Federated Conference on Computer Science and Information Systems, FedCSIS 2016, 8, 1243–1252. https://doi.org/10.15439/2016F37 | |
| dc.relation.references | Coşkun, E., Gezici, B., Aydos, M., Tarhan, A. K., & Garousi, V. (2022). ERP failure: A systematic mapping of the literature. Data and Knowledge Engineering, 142. https://doi.org/10.1016/J.DATAK.2022.102090 | |
| dc.relation.references | Daniels, C. B., & LaMarsh, W. J. (2007). Complexity as a Cause of Failure in Information Technology Project Management. 2007 IEEE International Conference on System of Systems Engineering, 1–7. https://doi.org/10.1109/SYSOSE.2007.4304225 | |
| dc.relation.references | Darias González, H., León de la O, D. M., Garcia Rodríguez, A. M., Arias Peregrino, V. M., Del Ángel Delgado, H., Hernández Arias, C., Darias González, H., León de la O, D. M., Garcia Rodríguez, A. M., Arias Peregrino, V. M., Del Ángel Delgado, H., & Hernández Arias, C. (2019). Factores limitantes en la implantación de MoProSoft. Revisión sistemática. Revista Cubana de Ciencias Informáticas, 13(4), 98–117. http://scielo.sld.cu/scielo.php?script=sci_arttext&pid=S2227-18992019000400098&lng=es&nrm=iso&tlng=en | |
| dc.relation.references | ERP implementation woes cost J&J Snack Foods estimated $20M | Supply Chain Dive. (n.d.). Retrieved March 9, 2023, from https://www.supplychaindive.com/news/j-and-j-snacks-erp-implementation-operation-woes/623226/ | |
| dc.relation.references | Eveleens, J. L., & Verhoef, C. (2010). The rise and fall of the Chaos report figures. IEEE Software, 27(1), 30–36. https://doi.org/10.1109/MS.2009.154 | |
| dc.relation.references | Fuentes Lombardo, G., Cañas Lozano, L., & Azmezcua Ogáyar, J. M. (2001). Análisis de las etapas críticas en la implantación de sistemas E.R.P. Congreso de Ingeniería de Organización. http://hdl.handle.net/11441/46691 | |
| dc.relation.references | Kaisler, S. H., Money, W. H., & Cohen, S. (2020). Forensic Analysis of Failing Software Projects: Issues and Challenges. https://hdl.handle.net/10125/70729 | |
| dc.relation.references | Kheybari, S., Rezaie, F. M., Naji, S. A., Javdanmehr, M., & Rezaei, J. (2020). Evaluation of factors contributing to the failure of information systems in public universities: The case of Iran. Information Systems, 92, 101534. https://doi.org/10.1016/j.is.2020.101534 | |
| dc.relation.references | Lidl SAP implementation failure (ERP Failure serie). (n.d.). Retrieved March 9, 2023, from https://www.dfsm.com.au/lidl-sap-implementation-failure-erp-failure-serie/ | |
| dc.relation.references | Mission Produce faces operational issues after botched ERP implementation | Supply Chain Dive. (n.d.). Retrieved March 9, 2023, from https://www.supplychaindive.com/news/Mission-Produce-ERP-implementation-operations-problems/620606/ | |
| dc.relation.references | Nelson, K. (2011). A Case For Using the Cost of Quality Approach To Improve ERP Implementations. SAIS 2011 Proceedings. https://aisel.aisnet.org/sais2011/36 | |
| dc.relation.references | Petter, S., & Lee, L. (2015). The Role of Liminality in Transitioning and Learning from Project Failures. International Research Workshop on IT Project Management 2015. https://aisel.aisnet.org/irwitpm2015/2 | |
| dc.relation.references | Reascos Paredes, I. M., & Carvalho, J. A. (2019). SImplE: A framework for the successful implantation of enterprise IT applications in small and medium enterprises. Proceedings of the 28th International Conference on Information Systems Development: Information Systems Beyond 2020, ISD 2019. | |
| dc.relation.references | Rincón, N. R., & Bacca, A. (2014). Why fail the software development projects? http://hdl.handle.net/10654/13523 | |
| dc.relation.references | Sardjono, W., & Retnowardhani, A. (2019). Analysis of Failure Factors in Information Systems Project for Software Implementation at the organization. Proceedings of 2019 International Conference on Information Management and Technology, ICIMTech 2019, 1(August), 141–145. https://doi.org/10.1109/ICIMTech.2019.8843725 | |
| dc.relation.references | Saxena, D., Dempsey, B., & McDonagh, J. (2016). Beyond the one-dimensional construct of failure: the curious case of enterprise systems failure rates (19). UK Academy for Information Systems Conference Proceedings 2016. https://aisel.aisnet.org/ukais2016/38 | |
| dc.relation.references | What Was the Real Story with the Revlon S/4HANA Failure? - Brightwork Research & Analysis. (n.d.). Retrieved March 9, 2023, from https://www.brightworkresearch.com/what-was-the-real-story-with-the-revlon-s-4hana-failure/ | |
| dc.relation.references | Wong, A., Scarbrough, H., Chau, P., & Davison, R. (2005). Critical Failure Factors in ERP Implementation. PACIS 2005 Proceedings. https://aisel.aisnet.org/pacis2005/40 | |
| dc.relation.references | Yusuf, Y., Gunasekaran, A., & Abthorpe, M. S. (2004). Enterprise information systems project implementation: A case study of ERP in Rolls-Royce. International Journal of Production Economics, 87(3), 251–266. https://doi.org/10.1016/J.IJPE.2003.10.004 | |
| dc.relation.uri | https://revistas.unab.edu.co/index.php/rcc/issue/view/293 | spa |
| dc.rights.accessrights | info:eu-repo/semantics/openAccess | spa |
| dc.source | Vol. 24 Núm. 2 (2023): Revista Colombiana de Computación (Julio-Diciembre); 1-11 | spa |
| dc.subject | Fracaso | spa |
| dc.subject | Paquete informático | spa |
| dc.subject | Casos | spa |
| dc.subject | Implantación | spa |
| dc.subject | ERP | spa |
| dc.subject.keywords | Failure | eng |
| dc.subject.keywords | Software package | eng |
| dc.subject.keywords | Cases | eng |
| dc.subject.keywords | Implementation | eng |
| dc.subject.keywords | ERP | eng |
| dc.title | Fracasos en la implantación de aplicaciones informáticas empresariales: Casos de estudio y sus principales causas | spa |
| dc.title.translated | Failures in the implantation of Enterprise IT Application: Case studies and their main causes | eng |
| dc.type.coar | http://purl.org/coar/resource_type/c_2df8fbb1 | |
| dc.type.coarversion | http://purl.org/coar/version/c_ab4af688f83e57aa | spa |
| dc.type.driver | info:eu-repo/semantics/article | |
| dc.type.hasversion | info:eu-repo/semantics/publishedVersion | |
| dc.type.local | Artículo | spa |
| dc.type.redcol | http://purl.org/redcol/resource_type/ART |
Archivos
Bloque original
1 - 1 de 1
Cargando...
- Nombre:
- Artículo.pdf
- Tamaño:
- 394.7 KB
- Formato:
- Adobe Portable Document Format
- Descripción:
- Artículo
Bloque de licencias
1 - 1 de 1
Cargando...
- Nombre:
- license.txt
- Tamaño:
- 347 B
- Formato:
- Item-specific license agreed upon to submission
- Descripción: